
6
INSTALLATION PROCEDURES
5.1. Mountjunctionbox(Soldseparately)
on expediter using gasket and locknut
provided.
5.2. Install power connection fittings (supplied
by others) and pull in power and ground wires.
5.3. Complete system wiring. See typical wiring
details below.
5.4. If using Thermon JB-K (sold separately)
Installjunctionboxlidusing4captive
screws.
Power Connection-3 Cables.
In-Line Splice and T-Splice
Typical Wiring Details
Ground Lug
Cable# 1
Cable# 2
Cable# 3
Ground
Power Supply
Cable# 3
Cable# 1
Cable# 2
Ground
L1
L2/N
Mount Junction Box and Make Connections
Ground
Cable
Power Supply
L1
L2/N
Power Connection-1 Cables.
L2/N
L1
Wire Nuts
Ground Lead
Comentários a estes Manuais