
4
PCA-COM
3.3. Feed cable and ground lead through
expediter base as shown. Feed cable
and ground lead through grommet (above
the crimp).
3.2. Trim braid to approximately 76mm (3”).
Crimp 12/10 AWG compression lug to
ground braid and ground lead.
3.1. Separate braid strands at edge
ofoverjacket and pullcable through
opening.
Ground Lead
Wire
12/10 AWG
Crimp
Expediter
Base
Grommet
Ground
Lead
8AWG Crimp
Cable
152mm
(6”)
Power connection for FLX-BC with braid only.
76mm
(3”)
Braid
3.4. Slide expediter toward pipe and route
cable through base, grommet, and NPT
threaded cap. Secure cap to base with the
captive screws.
3.5. Mount expediter to pipe using two (2)
circumferential bands of 19mm (3/4”)
wide tape.
3.6. Place UL
®
label provided as shown,
locate on opposite side from rectangular
side opening.
Pipe Heating Cable 134N
HSX
®
or FLX™ Heating Cable System
Install Cable per NEC Article 427
Thermon Manufacturing Co.
100 Thermon Dr., San Marcos, Texas 78666
1-800-730-4328 PN 27400
Tape Provided
Separately
UL Label
3.7. Cutandremoveprimaryinsulationjacket.
3.8. Skive outside of black matrix.
3.9. Cut V-Notch in matrix and pull bus wires
from matrix. Cut and remove center
matrix.
Do not cut bus wire strands.
117mm
(4-5/8”)
Bus Wire
Primary Insulation
Ground Lead
Matrix
Ground Lead
Ground Lead
Ground Lead
Black Matrix
Comentários a estes Manuais